Current research projects

Image Cool Up
Image Low Temperature Tribology
Image Reducing the filling quantity
Image Non- invasive flow measurements
Image Development of a Cryogenic Magnetic Air Separation Unit
Image Performance tests of refrigerant compressors
Image High Capacity Pulse Tube Cooler
Image Testing of mobile leak detectors according to DIN EN 14624
Image Innovative small helium liquefier
Image Overall System Optimization of Refrigeration Plant Systems for Energy Transition and Climate Protection
Image Measurements on ceiling mounted cooling systems
Image Range of services laboratory analyses
Image Ionocaloric cooling
Image Computational fluid dynamics CFD
Image Reduction of primary noise sources of fans
Image Influenced melting point of water by magnetic field

You are here:   /  Home


Innovative small helium liquefier

EuroNorm GmbH (BMWi)

Dr. Erik Neuber

+49-351-4081-5122

Liquefaction rates from 10 to 15 l/h

The goal of the R & D project is to explore new innovative ways to develop the functional model of a "helium liquefier for the small liquefaction rate". The development of such a system should cover the still non-existent area of the market.

 

This liquefier should contain several innovations and technical solutions:

  • Development of a helium liquefaction system with a liquefaction rate of 10 - 15 liters per hour of liquid helium.
  • Development of an innovative pre-cooling stage, which works with a mixture of helium and refrigerants as working fluid.
  • Detailed investigation of an innovative helium cycle within the development of the helium small liquefier with the ability to operate in different operating regimes: helium liquefaction, cooling and temperature stabilization/control.
  • Operation of the condenser with a liquefaction rate that can be varied over a wide range - between 75% and 100%.

Currently, the functional design of the helium small liquefier is being set up. The figure shows a 3D model of the cold box, in which all heat exchangers and cold valves are mounted. In the upper part of the cold box, two prototypes of low flow helium turboexpanders are mounted. All external components, piping and condenser control system are located on the front of the cold box.


Your Request

Further Projects

Image

Practical training, diploma, master, bachelor

Student training - Education at ILK

Image

Test procedures for electrical components

Insulating properties of hermetic compressors

Image

3D - Air flow sensor

Anemometer for determination of 3d-air flow