Current research projects

Image Influenced melting point of water by magnetic field
Image Innovative Parahydrogen Generator Based on Magnets
Image Performance tests of condensing units
Image Micro heat exchangers in refrigeration
Image Air-flow test rig for fan characteristic measurement
Image Brine (water)-water heat pump
Image IO-Scan - Integral measuring optical scanning method
Image Electrical components in refrigeration circuits
Image Preformance measurements of heat exchangers
Image Ice Slurry Generation
Image Refrigerants, lubricants and mixtures
Image Mass Spectrometer
Image Development of a Cryogenic Magnetic Air Separation Unit
Image Testing of mobile leak detectors according to DIN EN 14624
Image Electrochemical decontamination of electrically conducting surfaces „EDeKo II“
Image Laseroptical measurement

You are here:  Home /  Research and Development


Development of test methods and test rigs for stationary integrated refrigeration units

BMWi Euronorm Innokom

02/2017 – 07/2019

Andreas Peusch

+49-351-4081-5221

How efficient is my refrigeration unit?

The objective of the R&D project was the development of a test method for stationary integrated refrigeration units. The test method comprises different device variants, like ceiling mounted, wall mounted or split refrigeration units. The method provides reliable performance data and thus enables a manufacturer-independent efficiency comparison.

Measurements in the 3- or 4-chamber measurement setup were carried out using the calorimeter method with compensation of the ambient conditions. This enabled the measurements of devices with low cooling capacity (0.5 - 4 kW).

In the selected test setup (Figure 1), the cooling capacity is measured indirectly via an electrical power of the compensation heating. To determine the total cooling capacity, the heat input into the calorimeter room and, if necessary, internal loads (sensible and latent heat) have to be added together.

The test method comprises following features:

  • Suitable for low temperature devices (-20 °C) and normal temperature cooling (0 °C)
  • Measurement in the calorimeter room (3- or 4-zone concept)
  • Determination of heat input via enclosure surfaces before power measurement
  • Establishment of equilibrium conditions (settling phase) of the temperatures to be set (up to 24 h)
  • Measuring period up to 6 h with permissible tolerance band of 0.2 K

Conclusion:

  • Results were included in new test standard prEN 17432
  • Establishment of a uniform Europe-wide comparison criterion
  • Performance and efficiency data on a uniform basis leads to higher confidence and thus also to lower consumption costs

Your Request

Further Projects - Research and Development