Current research projects

Image Low temperature – test facilities
Image Hybrid- Fluid for CO2-Sublimation Cycle
Image Brine (water)-water heat pump
Image Low Temperature Measuring Service
Image Solar Cooling
Image Thermostatic Expansion Valves
Image Verification of storage suitability of cryo tubes
Image All-in-one device for freeze-drying and production of biomaterial
Image Tribological investigations of oil-refrigerant-material-systems
Image Micro heat exchangers in refrigeration
Image Software for test rigs
Image High temperature heat pump
Image Industry 4.0 membrane heat and mass exchanger (i-MWÜ4.0)
Image Combined building and system simulation
Image Hydrogen and methane testing field at the ILK
Image Panel with indirect evaporative cooling via membrane

You are here:  Home /  Research and Development


Development of test methods and test rigs for stationary integrated refrigeration units

BMWi Euronorm Innokom

02/2017 – 07/2019

Andreas Peusch

+49-351-4081-5221

How efficient is my refrigeration unit?

The objective of the R&D project was the development of a test method for stationary integrated refrigeration units. The test method comprises different device variants, like ceiling mounted, wall mounted or split refrigeration units. The method provides reliable performance data and thus enables a manufacturer-independent efficiency comparison.

Measurements in the 3- or 4-chamber measurement setup were carried out using the calorimeter method with compensation of the ambient conditions. This enabled the measurements of devices with low cooling capacity (0.5 - 4 kW).

In the selected test setup (Figure 1), the cooling capacity is measured indirectly via an electrical power of the compensation heating. To determine the total cooling capacity, the heat input into the calorimeter room and, if necessary, internal loads (sensible and latent heat) have to be added together.

The test method comprises following features:

  • Suitable for low temperature devices (-20 °C) and normal temperature cooling (0 °C)
  • Measurement in the calorimeter room (3- or 4-zone concept)
  • Determination of heat input via enclosure surfaces before power measurement
  • Establishment of equilibrium conditions (settling phase) of the temperatures to be set (up to 24 h)
  • Measuring period up to 6 h with permissible tolerance band of 0.2 K

Conclusion:

  • Results were included in new test standard prEN 17432
  • Establishment of a uniform Europe-wide comparison criterion
  • Performance and efficiency data on a uniform basis leads to higher confidence and thus also to lower consumption costs

Your Request

Further Projects - Research and Development

Image

High Capacity Pulse Tube Cooler

for Cryogenic High-Power Applications

Image

Thermal engines

Power Generation from Waste Heat

Image

Helium extraction from natural gas

Innovative solutions for helium extraction

Image

Ice Slurry Generation

Using Direct Evaporation

Image

Pulse-Tube-Refrigerator with sealed compressor

for mobil use in the hydrogen technology